Enduracon | Featured Project --- Brooklyn Center, MN Bridge Deck

This concrete base slab bridge deck in Brooklyn Center, Minnesota, along highway 694 and 252 was placed in May of 2017. The concrete was supplied by Aggregate Industries and was built by LUNDA Construction. A high performance topping mix was used for the finish surface. By using fibers in the base slab the Minnesota Department of Transportation (MN D.O.T) wanted to reduce cracking and prevent water intrusion through the concrete, which contributes to freeze thaw deterioration. The entire bridge deck was pumped and placed in one day. FORTA-FERRO® mixed evenly and uniformly and showed no difficulty in the pumping, placing or finishing of the concrete with 5 lb/yd dosage. Click here to learn more about this project.